Aller au contenu
GiftCoves
Demand Driven Material Requirements Planning (DDMRP), Version 3

Demand Driven Material Requirements Planning (DDMRP), Version 3

125,00 €

dans 1 boutique

Code-barres: 9780831136512

Toutes les offres

  • bol.com
    Demand Driven Material Requirements Planning (DDMRP), Version 3
    125,00 €
    En stock
    Voir la boutique

Nous pouvons percevoir une commission si vous achetez via ce lien. Le prix que vous payez ne change pas.

À propos de ce produit

In the 1950s, a method called Material Requirements Planning (or MRP) changed the world of manufacturing forever. But times have changed-customer tolerance times are shorter, product variety and complexity has increased, and supply chains have spread around the world. MRP is dramatically failing in this New Normal. Demand Driven Material Requirements Planning (DDMRP0) Version 3 presents a practical, proven, and emerging method for supply chain planning and execution that effectively brings the 1950s concept into the modern era. The foundation of DDMRP is based upon the connection between the creation, protection, and acceleration of the flow of relevant materials and information to drive returns on asset performance in the New Normal. Using an innovative multi-echelon Position, Protect and Pull approach, DDMRP helps plan and manage inventories and materials in today's more complex supply scenarios, with attention being paid to ownership, the market, engineering, sales, and the supply base. It enables a company to decouple forecast error from supply order generation and build in line to actual market requirements, and promotes better and quicker decisions and actions at the planning and execution level. DDMRP is already in use by MAJOR Global 1000 companies. This book is THE definitive work on DDMRP, and will be required as courseware for all those taking the Certified Demand Driven Planner (CDDP) Program. NEW FEATURES IN VERSION 3 Full color, with the use in specific, consistent, and focused ways to clearly and effectively highlight planning, execution, and model reconfiguration priorities. Expanded Appendix E, looking at the most recent innovations of DDMRP. Revised graphics scattered throughout the book.

Description fournie par bol.com.

Se connecter

Se connecter avec Google
ou

Indiquez votre adresse e-mail et nous vous enverrons un lien de connexion. Aucun mot de passe à retenir.