Aller au contenu
GiftCoves
Village Development Plan For Ekonjo And Upper Boando Villages

Village Development Plan For Ekonjo And Upper Boando Villages

24,99 €

dans 1 boutique

Code-barres: 9783656608431

Toutes les offres

  • bol.com
    Village Development Plan For Ekonjo And Upper Boando Villages
    24,99 €
    En stock
    Voir la boutique

Nous pouvons percevoir une commission si vous achetez via ce lien. Le prix que vous payez ne change pas.

À propos de ce produit

Project Report from the year 2009 in the subject Geography / Earth Science - Demographics, Urban Management, Planning, , language: English, abstract: A village development plan is a document that outlines clearly development procedures prepared by a village that can be used to mobilize potentials, capacities and allocation of resources. The goal is to move a village from its present situation to a desired one in an orderly and acceptable manner within a given time frame. It is a systematic approach that aims at sustainable management of natural resources and livelihood development at the village level. It is aimed at creating an environment for investors of the village in the long run.The purpose of the exercise was to guide the two villages prepare a development plan in a cluster fashion. A manual (including the different participatory and learning tools and methods) prepared by the PSMNR-SWP through its lead partner responsible for result 4 - DED was used throughout the planning process. The specific objective of the assignment was to assist the villagers find solutions for CBNRM strategies that shall contribute to improving livelihood as well as smaller infrastructure projects (demand driven), also find solutions for communal forest management activities and finally include within the VDP, a "Package" of priority interventions recommended for implementation through the PSMNR-SWP.The development planning process of Ekonjo and Upper Boando villages lasted a total of ten days. In each village, five days were spent so as to assess the base situation and document the strengths, potentials and problems for development. In the last two days, joint meetings were organized to finally select and prioritized the projects for the two villages, and also come out with a…

Description fournie par bol.com.

Se connecter

Indiquez votre adresse e-mail et nous vous enverrons un lien. Aucun mot de passe à retenir.

Continuer avec Google
ou